Lytham St Anne’s High School Showcasing a high bar table which worked well as a space optimiser whilst adding an classy industrial feel to the room,.. View this case study
South Shore Academy The stunning new build in Blackpool, required the installation of furniture in over 50 rooms across 3 floors of the building. View this case study
Laurus Ryecroft Covering the Tameside area, Laurus Ryecroft is a new 11 - 18 free school. When planning their new school building in Droylsden... View this case study
Bacup & Rossendale Grammar Not only aesthetically pleasing, but also versatile, the design optimises space... View this case study
Lostock Hall Primary Lostock Hall Primary is a leading teaching school involved in the training and mentoring of hundreds of new teachers. They required a large conference table for 18 with wire management capability... View this case study
Sharples School Sharples’ are a forward thinking school that has recently formed a multi academy trust in Bolton. The reception area is situated in a former Victorian mansion house so a bright and welcoming environment... View this case study
Daisyfield Primary School We were contacted by Daisyfield School to design a secure reception counter that would give the office staff vision of the entrance and central hub of the school but would also be welcoming to visitors. View this case study
Medlock Primary School On this project Glendale were tasked with knocking down walls to make one large children’s washroom. After a new ceiling, flooring, hygienic plastic wall covering... View this case study
Cardinal Allen Catholic High School For this project Glendale were asked to provide design proposals. We worked extensively with the school and the architects (Arcadis LLP) to make maximum improvements to the science laboratories. View this case study
Sharples High School Sharples’ vision for transforming their technology areas into vibrant new learning environments was achieved through installing functional but fun equipment with a focus on vivid colours and clean design. View this case study
Mount Carmel RC High An increased focus on IT teaching required an up to date, fully wire managed IT room with bespoke wave benching, dado trunking and computer cradles fitted unobtrusively below the desk surface. View this case study
St Phillips Primary School At the start Glendale Interiors were asked to come and measure a complex array of classrooms, corridors and meeting rooms for flooring to provide a new bright and fresh look. View this case study
St Phillip Primary Having done work in the school before, Glendale were able to supply the new classroom tables and chairs together with the new carpet, utilising the strips in the carpet to match... View this case study
Sharples High School Sharples’ vision for transforming their technology areas into vibrant new learning environments was achieved through installing functional but fun equipment with a focus on vivid colours and clean design. View this case study
West End Primary School "I have found working with Glendale a real pleasure, they are a professional, polite and friendly company that provide great service and excellent quality at a competitive price." View this case study
St Michaels High School Glendale were asked by architects Cowan & Co to provide a proposal for library furniture. We leased extensively with the school and the architects to find the best solution. View this case study
Archbishop High School "We approached Glendale in the summer term and explained our vision for the library refurbishment. They were able to match furniture to the colour scheme we had in mind..." View this case study
Thames Primary School Thames Primary is a large school with over 400 pupils situated at South Shore, Blackpool. We were contacted by award winning architect Andy Wolfe of Creative SPARC to design teaching walls... View this case study
Radcliffe Hall Primary School Following a new extension and make over of the school, Glendale were asked to come in and make suggestions for furniture for in the new areas. Their products are top quality and... View this case study